Skip to main content
en
nl
fr
de
Main navigation
Stories
Solutions
Cranes
Steelworks
Turnkey projects
Advice and best practices
About
Corporate story
What makes us tick
Contact
Secundary menu
Jobs
News
Subscribe
Social Media Links
search
Secundary menu
Jobs
News
Subscribe
en
nl
fr
de
TCS
Main navigation
Stories
Solutions
Cranes
Steelworks
Turnkey projects
Advice and best practices
About
Corporate story
What makes us tick
Contact
Fulltext search
Stories
Project stories of TCS customers
Filter on:
Category
Category
Turnkey projects
-Industrial Warehouses
-Industrial production units
-One of a kind projects
Steelworks
-Revamping steelworks
-Industrial steelworks
-Architectural steelworks
-Specific steelworks
Cranes
-Crane services
-Crane projects
-Process cranes
-Standard cranes
Tags
Tags
Project management
Plastics industry
Port facilities
Non-ferrous metals
New horizons
Manufacturing
Project management
Quality assurance
Various sectors
Waste treatment
Steel industry
Safety improvement
Railway industry
Machinery industry
Entertainment industry
Chemical industry
Construction industry
Capacity increase
Business continuity
Agro-industry
Custom service
Design
Engineering
Energy industry
Efficiency improvement
Education
Aerospace industry
or
New overhead cranes at Tata Steel Feijen Service Centre
We wanted a supplier willing to go the extra mile for us
Laurens Smit, Technical Purchase Manager at Tata Steel’s Feijen Service Centre, Maastricht, Netherlands.
Read more
Reading time
3 minutes
A simple idea with huge benefits
The project dramatically improved productivity
Willy Stevens, Business Unit Manager at Cuijpers Services, Netherlands.
Read more
Reading time
3 minutes
Shrewd decisions make for top performance
The crane manufacturer knows best how to optimize the crane beams for better performance
Maarten Kreemers, Production Director at Fingo Tessenderlo, Belgium.
Read more
Reading time
3 minutes
Engineering ingenuity making things work
We developed 3D-models to calculate the complex nodes
Peter Neven, Chief Engineer Cranes at TCS
Read more
Reading time
3 minutes
Corda Campus: refurbishing a manufacturing facility
We managed to fully engage all contractors within the construction team
Irina Vassileva, Architect Workplace Consultant at Procos Group
Read more
Reading time
4 minutes
ECLUSE: the largest industrial heat cluster in Europe
The project was completed within a very short time span
Jarne Van Meerbergen, Head of Projects and Modifications at Indaver/SLECO, Doel, Belgium.
Read more
Reading time
3 minutes
Aperam: astute investment accelerates delivery
“It’s important to keep our people motivated, isn’t it?”
Jaco Van Oirbeek, Internal Logistics Coordinator at Aperam Genk, Belgium
Read more
Reading time
3 minutes
The safe way to build steel structures overseas
We make sure that deadlines are met, and quality is high
Dirk Teuwen, Manager of the Steelworks Business Unit at TCS
Read more
Reading time
4 minutes
Construx: dealing with peculiar geometries
Formwork design and functionality can have a significant impact on project costs
Bart Meermans, Plant Manager at Construx Genk, Belgium
Read more
Reading time
4 minutes
Constructing two spectacular stages at Lowlands
We were like, going through hell. But the engineers surprised us with a touch of ingenuity. Magnificent.
Dirk De Decker, Director International Projects at Stageco
Read more
Reading time
5 minutes
Constructing while production continues 24/7
Detailed construction scenarios convinced me that it was a workable plan
Maikel Duchateau, Technical Manager at Vandersanden Bilzen, Belgium
Read more
Reading time
4 minutes
Prefaco: using vintage cranes to handle 18-metre slabs
It was a great idea to install tandem control on our two old portal cranes
Ben Gysen, Technical Team Leader at Echo-Prefaco
Read more
Reading time
3 minutes
Make-over without interrupting operation
High safety awareness and rigorous execution of tasks are indispensable.
Cyrille Cattry, Project Engineer at Yara, Tertre (Belgium)
Read more
Reading time
4 minutes
Enclosing the Tata Steel Protact® production line
This brilliant idea drew inspiration from the construction of concert tents
Peter Borremans, Technical & Process Manager at Tata Steel Duffel (Belgium)
Read more
Reading time
3 minutes
Upgrading older cranes to current standards
Assembly conditions were difficult and manoeuvring space was tight
Filip Roelandt, Project manager at Kronos Europe, Ghent (Belgium)
Read more
Reading time
4 minutes
The giant revolving Beyoncé stage
We initially thought of turning down the commission, but then we spoke with TCS
Dirk De Decker, Director International Projects at Stageco
Read more
Reading time
4 minutes
Pagination
Page 1
Next page
››